Transmitter Evaluation


The NRQZ Office reviews all applications to ensure that the computed power flux density at the reference point does not exceed frequency-dependent thresholds.

In some instances, the transmitter power requested by an applicant exceeds the level that is harmful to observations in Green Bank or Sugar Grove. When this occurs, applicants should discuss possible modifications to their transmitters (e.g. using a directional antenna, relocating the antenna to an area that provides additional terrain shielding, or selecting a different frequency where the power density limits are different) with the Interference Office. In our experience, a technical solution can almost always be found to provide the area coverage desired by the applicant while simultaneously minimizing the impact of the interference upon Green Bank or Sugar Grove. In the extremely rare case when differences between the applicant’s desires and the Interference Office’s evaluation cannot be resolved, both the applicant and the Interference Office should forward comments on the transmitter installation to the FCC or IRAC for a final resolution.

We emphasize that the Interference Office has no authority in the granting of an FCC license or a Federal Government frequency assignment. The Interference Office only has the privilege of submitting its comments on a particular transmitter installation to the FCC or IRAC.

Applicants who feel that their applications have been evaluated unfairly or inadequately can contact the office of the Green Bank Site Director for a review of their circumstances.